Drafting Gallery

BAG-FILTER-PIPING-PLAN-AND-SECTION-(D104-&-D301)_Page_1

Bag Filter Piping plan and section

BLOWER-BUILDING-(M11-1-&-M11-2)---(REV-A)_Page_1

Blower Building

CHEMICAL-AND-UTILITY-BUILDING-(M-503-&-M-504)-REV-A_Page_1

Chemical and Utility Building

CW-202-VALVE-VAULT-DETAIL-(REV-A)

Valve Vault Detail

OXIDATION-DITCH-PLAN-AND-SECTION-(M2-1,-M2-3-&-M2-4)-(REV-A)_Page_1

OXIDATION DITCH PLAN AND SECTION

PROCESS-SITE-PLANS-AND-SECTIONS-(M-100,-M-101-to-M-110)---(REV-B)_Page_01

PROCESS SITE PLANS AND SECTIONS

PUMP-HOUSE-MECHANICAL-PLAN-AND-SECTION-(M8)---(REV-A)_Page_1

PUMP HOUSE MECHANICAL PLAN AND SECTION

WTP-MECHANICAL-PLAN-AND-SECTION-(M1,-M4-&-M5)---(REV-A)_Page_1

WTP MECHANICAL PLAN AND SECTION

YARD-PIPING-PLAN-&-PROFILE-(C7,-C9,-C11,-C13,-C14-&-C15)---REV-A_Page_1

YARD PIPING PLAN & PROFILE

Your Waterworks Solutions Partner

Build a Better Infrastructure with RJ Barnes and Associates